ExplorMine Consultants was commissioned by Atlatsa Resources Corporation (Atlatsa) to complete a National Instrument 43-101 Technical Report, in support of obligations in terms of Canadian Securities Regulatory Authorities.

Atlatsa Resources is a platinum group metals mining, exploration and development company, controlling the third largest Platinum Group Minerals  resource base in South Africa. Atlatsa controls and operates the Bokoni Platinum Mines, located on the Eastern Limb of the Bushveld Complex.

Bokoni Mine is located on the northern extremity of the Eastern Limb of the Bushveld Complex. The platiniferous horizons mined at Bokoni Mine are the Merensky and the UG2 reefs, located in lithologies of the Critical Zone of the Rustenburg Layered Suite. In the Eastern Limb, the Critical Zone is developed over about 150 km of strike length in three areas separated by regional faulted systems. The Merensky Reef and UG2 outcrop over about 130 km, but also occur in down-faulted blocks and erosional outliers. In the Eastern Limb, the Merensky Reef comprises a facies somewhat different when compared to the equivalent reef that is developed within the Western Limb. In common, however, is the fact that in both the Eastern and Western Limbs, the mineralisation is hosted within the pyroxenite and between relatively narrow (2 mm to 5 mm) chromitite layers. The chromitite forms useful mining contacts that visually define the position of the orebody.

Similar Projects

Lesotho Alluvial Diamond Project
Lesotho Alluvial Diamond Project
Lesotho Alluvial Diamond Project
ExplorMine Consultants together with its partner, Delma Projects in Lesotho, is excited to be involved in the development of an alluvial diamond project in northeastern Lesotho, in the Mokhotlong District. The project is located on a 13.2 square kilometer prospecting license for which the application has been submitted, with a pending EIA. Anecdotal reports from [...]
Koalabta Pipe 307 Project
Koalabta Pipe 307 Project
Koalabta Pipe 307 Project
ExplorMine Consultants is currently partnered with Paramount Mining and Energy Pty Ltd and Delma Projects to develop the Koalabata Pipe 307 diamondiferous pipe and associated kimberlite dykes on a 19.3 square kilometer exploration license located east of Maseru, Berea District, Kingdom of Lesotho. A crescent shaped diamondiferous pipe of about 1.89 ha (~300 m x 70 m) has been delineated [...]
Target 3 Shaft geological modelling and mineral resource estimation
Target 3 Shaft, Free State Goldfields, South Africa
Target 3 Shaft, Free State Goldfields, South Africa
ExplorMine Consultants was commissioned by Harmony Gold Mining Company Limited in mid-2017 to complete a Mineral Resource Estimate as per the South African code for Reporting of Exploration results, Mineral Resources and Mineral Reserves, for the Basal Reef in the southern portions of the Target 3 Shaft. The Mineral Resource estimation is based on historic drillhole data, channel [...]
Tailings storage facilities exploration drilling and mineral resource estimation
Tailings Storage Facilities – Drilling and Estimation
Tailings Storage Facilities – Drilling and Estimation
ExplorMine Consultants has been commisioned by various clients to manage and supervise Tailings Storage Facility (TSF) drilling and sampling programmes, as well as complete Mineral Resource estimations for these TSF's. An auger drilling technique is utilised to drill the TSF’s due to the relative ease and low cost of the method. In addition, the TSF [...]